We are certified contractors using the latest under bridge rigging and traffic control technologies in over 30 states.

Introducing the Aspen A-62T Bridge Inspection Unit

9/4/2020

All Access Rigging announces the arrival of a new 2021 Aspen A-62T Bridge Inspection Unit with extended sidewalk and fence clearance capability.

  • Boom 1 Horizontal and Vertical Reach
  • Fence/Sidewalk Clearance: 15'/17'
  • Horizontal Reach Under Bridge: 61' 9"
  • Vertical Reach Down: 69'
  • Vertical Reach Up: 53'

This new equipment increases and improves the service All Access Rigging is able to provide. For more information on the 2021 Aspen A-62T Bridge Inspection Unit or All Access Rigging, contact us online. 


^