9/4/2020
All Access Rigging announces the arrival of a new 2021 Aspen A-62T Bridge Inspection Unit with extended sidewalk and fence clearance capability.Boom 1 Horizontal and Vertical ReachFence/Sidewalk Clearance: 15'/17'Horizontal Reach Under Bridge: 61' 9"Vertical Reach Down: 69'Vertical Reach Up: 53'This new equipment increases and improves the service All Access Rigging is able...
5/23/2016
Nicholas Guzma at the 2016 ASHE (American Society of Highway Engineers) Conference May 19-22, 2016.
Nicholas, Maria, Michael and I want to thank everyone that visited our Booth No. 203.
Congratulations to the 2016 ASHE Conference Committee, great job.
See you next year in New York!
...
4/26/2016
Location: Leadmine Brook Bridge
Thomaston, CT
Equipment: Hydra Platform Trailer-Mounted HP35 Bridge Rigging stage.
...
2/10/2016
Michael and I want to thank everybody that visited and voted for
our exhibit booth at the 2016 MdQI (Maryland Quality Initiative)
last week. We sincerely appreciate your support.
Thanks,
Amy Guzma
...
1/28/2016
Mike Guzma, and Alan Ladd with All Access Rigging Co.
participated in an Equipment Maintenance and Safety Training held
by the Connecticut DOT on January 28th 2016.
...